- Handling: ensure that shipping, storage and handling procedures provide factory finished components free from scratches, abrasions, corrosion and damage.
- Identification: label each crate to identify contents. Include detailed inventory in each crate cross-referenced to component coding or identification system.
- Deliver materials to site to ensure uninterrupted progress.
- Store materials to provide easy access for inspection and identification.
ERECTION
This section is given as guidance to the contractor. Method statement is to either confirm abiding by these guidelines or propose alternative systems.
Quality control is the hands-on part of quality assurance. It is the observation of techniques and activities used to fulfill the requirements and plans set forth by quality assurance. While quality control is often a part of operations, Quality control isn’t an effective quality management system.